|
Frame blasted for the first time, ready for the fab work and inspection for cracks and other damage that could not be seen with the layer of dirt and grease
|
Drivetrain mocked in and suspension welded on
|
Transfer case held in place so a new tubular crossmember can be fabed up, the new trans moved the transfer case back
|
|
The 9" housing was cracked with a attempted fix that did not hold fluid, the old weld was ground off and rewelded with a drain and a fill plug bung welded in so the fluid can be changed easily
|
The new dual shock hoop and dropped trac arm bracket welded in place, notice the steering box cracked accross the top
|
All the new suspension items welded in place, the dana 30 will be replaced by a new dana 44, the carrier was destroyed before, knocking two holes in the housing, and pulling the bearing cap bolt out of the housing, and was rapaired incorrectly
|
|
Frame imperfections fixed and cleaned up, heading for the final blasting and then painted
|
All of the loose suspension items heading for the final blasting and ready to be painted
|
Frame fresh in from the booth sprayed victory red
|