|
This trans cooler is all beat up, the rubber lines leak, and it is zip tied to the X brace
|
Core support and brace before modification is to begin
|
Bracketry and ss lines for the new cooler fabricated
|
|
Ready to blast and paint the front end
|
New power steering pump with the new ss hard line to replace the factory hard line that was in bad shape
|
Factory 166,000 mile timing chain still perfect
|
|
Motor work all finished with the new RJC aluminum pulleys installed
|
Custom made cryo bar installed behind the shroud
|
Intercooler cover installed with the cryo bar fitting poking out
|