Jeep as it came to us
Date: 10/12/06
right front inner fender before blasting
Date/Time: 2004:02:05 12:19:08
some of the rust on the left front inner fender
Date/Time: 2004:02:05 12:31:22
left front inner fender before blasting
Date/Time: 2004:02:05 12:16:06
outside of the left inner fender
Date/Time: 2004:02:05 12:16:55
core support before blasting
Date/Time: 2004:02:05 12:19:19
some of the rust on the core support
Date/Time: 2004:02:05 12:42:40
core support after blasting and cutting out the rust prepairing to make patch panels
Date/Time: 2004:02:06 09:26:11
both inner fenders after blasting
Date/Time: 2004:02:05 14:09:12
In the process of blasting the body
Date: 11/04/06
Body before sand blasting
Date: 11/04/06
Floor board before blasting
Date: 11/04/06
various areas of rust being cut out and replaced
Date/Time: 2004:01:30 17:59:05
various areas of rust being cut out and replaced
Date/Time: 2004:01:29 14:17:39
more rust repairs
Date/Time: 2004:04:02 15:21:43
more rust repairs
Date/Time: 2004:01:29 14:18:31
evan more rust repairs
Date/Time: 2004:01:30 15:00:20
Mocking up the inner fenders and the core support bushing
Date: 11/04/06
Filling in the transmission tunnel cover, and the areas where the rust was cut out
Date/Time: 2004:01:29 14:17:18
firewall blasted for the first time and the areas ground ready to weld in patch panels or weld up the small holes
Date/Time: 2003:11:25 12:01:38
We installed the fender and found that the bottom corner had beeen cut off.
Date/Time: 2004:02:05 12:16:28
Firewall filled and ready to blast again, then prime and block sand
Date/Time: 2003:12:03 13:21:39
Body and dash cut out ready for the patch panels to be made
Date/Time: 2003:11:25 12:01:57
Firewall and dash filled in ready for final blasting, then body work to make the dash look original again
Date/Time: 2003:12:02 13:29:08
every thing welded and filled that will not be used again
Date/Time: 2003:12:02 13:28:57
fitting the a/c box and speaker grille filled in, the radio, and a/c control head holes have been cut
Date/Time: 2004:02:02 16:43:57
dash ready for paint
Date/Time: 2004:04:01 16:26:11
Firewall primed ready for the final block sand than the color
Date/Time: 2004:04:01 16:25:55
Body ready for the final primer coat than the color
Date/Time: 2004:04:01 16:25:34
Body painted and interior Rhino Lined
Date/Time: 2004:05:03 09:52:11
firewall finally finished
Date/Time: 2004:05:03 09:51:49
Hot Rod Air a/c case with vacuum solenoids ready to install
Date/Time: 2004:02:03 09:44:59
dash coming together
Date/Time: 2004:05:20 08:07:04
Gauge cluster ready to go in
Date/Time: 2004:06:09 11:23:36
A/C box installed, with a/c and heater hoses installed and hooked up
Date/Time: 2004:05:07 12:07:14
MSD 6A box installed out of the way and not in the engine compartment
Date/Time: 2004:05:06 16:00:35
Dash is finished, Autometer gauges in a custom panel, along with the unique a/c vents, and swith panel
Date/Time: 2004:06:10 16:59:38
Mocking up the engine with the lift springs installed
Date: 10/13/06
Lightly blasting the rear axle housing
Date: 11/04/06
Frame coming together, suspension brakes, fuel and brake lines finished
Date: 10/13/06
Everything is finished except the ss gas tank and battery cables
Date/Time: 2003:10:29 12:23:00
Engine and transmission complete ready for the body to be installed
Date/Time: 2004:05:05 11:46:20
Custom stainless steel gas tank with baffle 1/2" fuel pick up and AutoMeter sending unit
Date/Time: 2003:11:13 09:34:29
All the fuel, brake lines, and power cables for the batteries and winch plugs both front and rear ran ready for the body to be installed
Date/Time: 2004:05:05 11:46:05
March Performance pulley system
Date/Time: 2003:11:04 13:41:39
Body freshly mounted
Date/Time: 2004:05:07 12:06:32
Core support ready for the radiator and condensor
Date/Time: 2004:05:14 12:32:29
Lower radiator bracket also holds the dual fan assembly and the large Griffen radiator
Date/Time: 2004:05:20 08:06:36
Transmission cooler, a/c condensor w/fan, and headlight installed and connected
Date/Time: 2004:07:28 12:06:02
All chrome grille shell installed
Date/Time: 2004:06:09 11:22:24
Close up of the grill area
Date/Time: 2004:07:16 14:43:09
Upper radiator and fan shroud mount, along with a cuatom hood latch pull made out of ss rod
Date/Time: 2004:06:09 11:23:13
Upper radiator and fan shroud mount
Date/Time: 2006:08:28 09:50:38
Stainless steel a/c and heater hoses installed
Date/Time: 2006:08:28 09:50:15
Close up of the brake system, with the adjustable perportioning valve on the frame, before the column is installed
Date/Time: 2004:05:13 12:26:24
Factory column with Kugal shifter installed
Date/Time: 2006:08:28 09:51:00
Close up of the front suspension and brakes
Date/Time: 2004:06:03 13:07:27
Close up of the custom ss tank, rear suspension and brakes
Date/Time: 2004:06:03 09:07:19
Close up of the front suspension with the custom drop brackets for the Addco sway bar, and steering stabilizer
Date/Time: 2004:07:16 14:45:51
Dual stick shifter for the transfer case made from a dirt track shifter
Date/Time: 2004:07:01 10:02:33
Linkages for the shifter
Date/Time: 2004:07:01 10:01:55
Factory seat brackets mounted to the new seats
Date/Time: 2004:06:07 12:23:25
High back buckets with pass thrus for the 5 point safety harneses
Date/Time: 2004:06:07 17:41:37
Factory dash recovered to match the seats
Date/Time: 2006:08:28 09:23:51
Customer did not like the original fabric and look after driving the Jeep for awhile so Stiches recovered the front two along with the rear seat
Date/Time: 2006:08:28 09:24:13
Jeep ready for some custom tube bumpers
Date/Time: 2004:06:09 11:25:26
1/2" ss tube with the rear wiring ran in it along with the gas tank fill tube
Date/Time: 2004:06:10 16:58:48
Cover for the filler neck also Rhino Lined
Date/Time: 2004:07:16 14:43:42
Dual batteries yellow top for the winch and stereo, red top to start the Jeep with, and a isolator to keep them both charged
Date/Time: 2004:07:19 15:27:56
Custom heavy gauge ss battery cover installed to protect the batteries and the interior from the batteries
Date/Time: 2004:07:16 14:41:38
Mandrel bent all ss including the muffles sounds good not to loud just right
Date/Time: 2004:07:16 14:46:01
We got the Jeep this far so we could take it to the customers wedding in Fredricksburg, so that his family and friends from out
Date/Time: 2004:06:09 11:24:55
Jeep has come back to finish the top, bumpers, nerf bars, and stereo
Date/Time: 2006:08:28 14:02:51
Date/Time: 2006:08:28 14:02:34
DSCN1583
Date/Time: 2006:10:07 13:49:13
DSCN1584
Date/Time: 2006:10:07 13:49:37
DSCN1585
Date/Time: 2006:10:07 13:49:59
DSCN1586
Date/Time: 2006:10:07 13:50:28